Home
About Us
Lighting Large Areas
Technical Details
Lighting Design
Installation
Maintenance
Project Gallery
News
Downloads
Contact Us
International Partners

Project Gallery (Click for larger images)

east midlands entrance to carpark east midlands night time
ABP Immingham
Birkenhead Ro-Ro
Costco
Fort Dunlop M62 Junction

Some comments from our clients:

Royal Mail Distribution Hub 6 x 20 M Masts
Derry Building Services

“Kingfisher were selected for this project over the original specified manufacturer as they offered an extremely tempting package.   Their quote was competitive and offered a quality mast system that could be delivered and installed within our deadlines.  From start to finish dealing with Kingfisher was stress free.”

John Hollingsworth
Design Manager
Derry Building Services

East Midlands Airport Long Stay 6. 5 x 25M Masts
Lafarge

“From the initial enquiry through to final installation and commissioning Kingfisher demonstrated total professionalism. From a quality perspective, the high mast system was world class and overall the package offered was exceptionally competitive. We have formed a great working relationship and I look forward to working with Kingfisher on other projects.  A delight to work with.”

Craig Brown
Civils Project Manager
Lafarge

“Kingfisher Lighting were selected as the preferred supplier for Long Stay 6.  We have used Kingfisher for several other projects and have always found the quality of service and product to be of a very high standard.    The product and service received at Long Stay 6 was no exception".

David Howell IEng MIET
Head of Engineering
East Midlands Airport

“Just a few words to thank you for your help and co-operation in respect of the recent electrical  installation works to car park 6 at East Midlands Airport, as you are aware this contract was fast tracked to meet the clients requirements and it was therefore essential that we co-ordinated our works efficiently. We look forward to working with you in the future and would have no hesitation in specifying your company for future work”.

John Wing
General Manager
Frederick Lamb Ltd
Electrical Engineers and Contractors

 

 
High Mast Installations to Date
SITE NO OF MASTS
Leeds Inner Ring Road 11 x 25 M 
5 x 35 M
Albert Street 2 x 25 M   
Extor Shipping 2 x 25 M   
Osbourn Sidings 3 x 25 M  
Rugby Cement
Humberside
1 x 30 M  
Oxford United FC 4 x 25 M 
Barnsley Interchange 2 x 20 M 
Ro-Ro Terminal Birkenhead 8 x 30 M  
HIT Site Immingham 6 x 25 M 
Robinson Road Bulk Storage 1 x 25 M 
Doncaster Bus Depot 1 x 20 M 
Ipswich Docks 1 x 30 M 
Nordic Terminal
Immingham
ABP
4 x 25 M
King George Docks
ABP
5 x 25 M
Henderson Quay
Immingham

ABP
4 x 25 M
Caldaire Bulk Handling
Goole
ABP
3 x 25 M
East Midlands Airport  
Fitzpatrick
9 x 25 M
Wakefield / Pontefract
Mowlem
7 x 25 M
Monks Cross Retail Park
Crown House Eng
8 x 25 M
West Burton Power Station
Lilleker
1 x 20 M 
NET Line 1 Park & Ride
Carillion
5 x 30 M 
Project William
N G Bailey
2 x 25 M
Newark Lorry Park
Harlite Installations
3 x 25 M
Guernsey Airport
Lorne Stewart
2 x 20 M 
Olive Grove Bus Depot
Albert Innes
1 x 20 M 
Tilbury Docks
Tilbury Container Service
2 x 35 M 
Royal Mail Distribution Hub
Derry Building Services
2 x 20 M
Cardiff Airport
ATG Airports
2 x 25 M
Dartford Football Clu
Mitie Scotgate
4 x 18 M
Royal Mail Distribution Hub
Derry Building Services
6 x 20 M
East Midlands Airport Long Stay
Lafarge
5 x 25 M